Rolvenden Signal Box

My tour of Rolvenden Works on the Kent and East Sussex Railway, had an added bonus that I wasn’t expecting – a look inside the substantial signal box.  It is the line’s largest signal box and like everything (save the concrete water tower) on the site, was installed in preservation.  The design is based on LB&SCR practice…

The Oldest Working Diesel-Electric Locomotive in the UK

A tour of Rolvenden works gave an opportunity to get close to a rare Diesel-Electric locomotive, constructed for Ford’s Dagenham factory by the British Thompson Houston Company (BTH).   Diesel-electric No. 40 is a Bo+Bo shunter, built along similar lines to American Switcher locomotive’s, hence it looking different to most equivalent machines in the UK.  The American connection is natural enough…

A Riveting Video! Plus Two More….

It’s CanPac movie night tonight!  We begin with the video above that shows heritage railway restoration skills in action, with the Watercress Line’s staff from the boiler shop riveting the bufferbeam and frame extensions of 3505 Canadian Pacific.  The team seemingly made the work look easy and easily completed the work in a day.  With this complete, the…

Watercress Line Carriage Shop Update

The Watercress Line’s carriage shop has just posted an update from April 2016, that includes ex-works pictures of the two types of Bulleid carriage being restored – 1456 and 4367.  The restoration of these two carriages is being undertaken as part of the Heritage Lottery Funded Canadian Pacific Project.  Please click on the following link…